16 MW Power Secured ~20 MW IT Capacity Warsaw Region / EU-Central Build-Ready Phase I 10 MW Renewable Roadmap NDA-Restricted Data Room 16 MW Power Secured ~20 MW IT Capacity Warsaw Region / EU-Central Build-Ready Phase I 10 MW Renewable Roadmap NDA-Restricted Data Room
LIVE  ·   PROJECT BRIEF / 2026.Q2 52° 13′ N · 21° 00′ E EU-CENTRAL / WARSAW REGION REF · GAC-001

POWER. READY. scalable.

Infrastructure campus for Data Centers and AI — combining secured power, investment readiness and phased development in one Warsaw region location.

Where new grid connection terms can take years, the power is available now. Where others wait for approvals, this project is ready to move.

Grid connection capacity01
16MW
secured and ready to activate
Infrastructure02
110kV
high-voltage line on site
IT scalability03
~20MW
target campus capacity
Renewable energy04
~10MW
renewable capacity roadmap
Campus site05
2.4ha
land with complete documentation
Start the conversation Explore the project
NDA Data Room Strategic Partners Only
16 MW secured Build-ready ~20 MW IT green energy 2.4 ha Warsaw region 110 kV JV / BTS / Lease 16 MW secured Build-ready ~20 MW IT green energy 2.4 ha Warsaw region 110 kV JV / BTS / Lease
02 · Why this project

A location designed for digital infrastructure.

We remove the three main barriers to data center development in Europe: access to power, delivery timing and the ability to scale for AI workloads.

Visualization of a data center campus in the Warsaw region
[ 01 / POWER ]

Secured power

16 MW of secured grid connection capacity with room for further expansion. In a market where new connection terms can take years, this is a real commercial advantage.

[ 02 / SPEED ]

Fast market entry

Formal readiness of the first phase shortens the investment timeline. Instead of years of administrative waiting, the project can move directly toward construction.

[ 03 / SCALE ]

Scalable campus

The campus model enables growth from ~10–12 MW IT in Phase I to ~20 MW IT at full build-out while keeping the infrastructure consistent.

[ 04 / ESG ]

ESG by design

Renewable energy integration and operational efficiency are built into the project, not added later. The campus is prepared for rising regulatory expectations.

03 · Energy advantage

An energy model designed to reduce operating costs.

The campus architecture combines secured grid connection, 110 kV infrastructure and scalable renewables, translating into measurable OPEX savings.

Abstract visualization of green energy flow
20–30%
energy cost
reduction
Current renewable capacityexisting renewable sources
~1.8 MW
Target renewable capacityscalable renewable sources
~10 MW
Potential savingsat 10 MW IT, annually
PLN m

// How it works

  • On-site energy offsets grid draw
  • Lower costs during peak hours
  • More stable long-term costs
  • Exposure to the green certificate market
04 · Infrastructure

Comprehensive technical infrastructure.

Fully prepared infrastructure enabling reliable, efficient and scalable data center operations from day one.

High-voltage energy infrastructure
/ 01

Energy

  • 15 kV connection (2×8 MW)
  • 110 kV infrastructure on site
  • Scalable architecture
  • High reliability and redundancy
/ 02

Connectivity

  • Fiber-optic infrastructure
  • Multiple routing paths
  • Access to major network operators
/ 03

Media

  • Secured water and sewage conditions
  • Capacity for large-scale investment
  • Ready for data center requirements
/ 04

Renewable energy

  • ~1.8 MW current capacity
  • Up to ~10 MW target capacity
  • PV + storage integration
  • Lower cost, greener future
/ 05

Cooling

  • Access to distribution infrastructure
  • Heat recovery potential
  • Energy efficiency strategies
05 · Development plan

Phased infrastructure development.

The campus architecture is designed so each phase is a standalone, operational infrastructure layer, ready to operate independently of future expansion.

Technical visualization of the planned data center facility
// PHASE I Build-Ready

Phase I

~6,000 m² · 10–12 MW IT
  • Formal project readiness
  • 10–12 MW IT capacity
  • Fast path to deployment
// PHASE II Pipeline

Expansion phase

Up to ~20 MW IT
  • Full capacity up to ~20 MW IT
  • Scalable infrastructure
  • Long-term growth

Investment approach.

/ 01

CAPEX optimization

The phased model aligns CAPEX with current market demand without excessive upfront financing.

/ 02

Risk reduction

Each stage is standalone, operational infrastructure, ready to run independently of future expansion.

/ 03

Demand-led scaling

The campus architecture keeps infrastructure coherent at every growth stage, from the first MW to full capacity.

Phase 0
Preparation
Now
Formal readiness
Phase I
10–12 MW IT
Scaling
Renewable energy
Phase II
~20 MW IT
Target
Full campus
06 · Partnership models

Flexible investment structures.

Green AI Campus is an infrastructure platform open to cooperation with data center operators, hyperscalers, infrastructure funds and strategic partners.

[ Model 01 / Land Lease ]

Land lease

A long-term land lease model providing secure access to the site, full operational control and flexible spatial development.

Land Lease
[ Model 02 / Build-to-Suit ]

Build-to-Suit

Infrastructure designed and delivered around a partner’s specific technical requirements, from concept to an operator-ready facility.

Custom Build
[ Model 03 / Joint Venture ]

Joint Venture

A strategic partnership for joint campus development, value sharing and risk sharing, aimed at investors seeking long-term involvement and control.

Strategic Partnership

The final cooperation structure is defined individually, taking into account the investor’s goals and the full potential of the project. The project is currently being discussed with selected partners.

Contact us
07 · Key strengths

Project value summary.

Power Secured 16 MW
Formal Readiness Build-ready
IT Scaling ~20 MW
Infrastructure Full stack
Energy Edge −20–30%
Location Warsaw region
08 · Data Room

Access to detailed information.

Data center server aisle

Full technical documentation, connection terms, development plans and financial analysis are available to interested investors after signing an NDA.

Access after signing an NDA — full protection for all parties.

Confidential and secure

Full protection of investor data

Technical documentation

Detailed project specifications

Grid and utilities data

Connection conditions

Project materials

Campus development plans

09 · Contact

Start the investment conversation.

Green AI Campus is available to strategic partners and investors interested in developing data center and AI infrastructure in Central Europe.

// Direct contact

Meeting availability open
Response time ≤ 48 h
Project stage Pre-Construction

Book a meeting

Contact our team about investment opportunities.